Building a home is one of the largest investments you will make. Here is how we approach it — clearly, step by step.
From first meeting to front door.
Indicative timeframes for a typical single-storey custom home. Every project is different; we confirm a programme in your contract.
| Stage | What happens | Indicative timing |
|---|---|---|
| 1. Consultation & site review | We meet on your block, discuss your brief and budget, and assess site conditions such as slope, soil and services. | 1–2 weeks |
| 2. Design & selections | Concept plans, revisions, then finalised working drawings. Selections of finishes, fixtures and colours with our team. | 4–10 weeks |
| 3. Quotation & contract | A detailed, itemised fixed-price quotation followed by a formal building contract and deposit. | 2–3 weeks |
| 4. Engineering & approvals | Soil test, structural engineering, energy rating and building permit through your local council. | 6–10 weeks |
| 5. Construction | Site works, slab, brickwork, roof, lock-up, fit-out and finishes, supervised throughout with regular progress updates. | Confirmed in your contract |
| 6. Practical completion & handover | Joint quality walk-through, defect rectification, keys and handover documentation. | 1–2 weeks |
| Maintenance & warranty | A maintenance inspection after handover and ongoing structural warranty under your contract. | Ongoing |
Progress payments, explained.
You only pay as each construction stage is completed and verified. Each claim is issued with photos of the completed work.
Contract signing
Paid on signing the building contract, within the limits set by your state’s home building legislation.
Slab & frame
Claimed as the slab is poured and walls reach plate height.
Roof & enclosure
Roof covered, windows and external doors installed.
Fit-out & handover
Fixing stage, then the final claim at practical completion.
Premium as standard.
A summary of what is typically included. Your quotation lists every item in full.
| Structure | Engineered concrete slab, double-brick or framed construction, Colorbond or tiled roof |
| Ceilings | Generous ceiling heights with square-set or cornice options |
| Kitchen | Stone benchtops, soft-close cabinetry, quality stainless appliances |
| Bathrooms | Floor-to-ceiling tiling to showers, frameless screens, quality tapware |
| Energy | Insulation and glazing to meet or exceed energy-efficiency requirements |
| External | Exposed aggregate or paved driveway, letterbox and clothesline |
Common questions.
Can’t find what you’re looking for? Contact us and we will answer it directly.
How much does it cost to build a custom home?
Cost depends on size, design complexity, site conditions and level of finish. After an initial consultation we provide a preliminary estimate, followed by a detailed fixed-price quotation once plans and selections are finalised.
Do you work with my own architect or designer?
Yes. We’re happy to build from client-supplied plans, and we can also introduce you to designers we trust. We review drawings for buildability and cost before you commit.
What is a fixed-price contract?
A contract in which the price is agreed before construction begins. Any change to the price can only happen through a variation you approve in writing.
How will I know what is happening on site?
Your site supervisor keeps you updated with the current stage, upcoming milestones and site photos, and you can contact your builder directly at any time. You can also follow your documents, updates and photos in your secure Genclass client portal.
What happens after handover?
We complete a maintenance inspection after handover and remain available for any warranty matters for the period set out in your contract and the relevant legislation.